Overhaul. They are mandatory equipped with heat registration and regulation systems. Over the next two to three years, this work will be completely completed. Since 2011, the reduction in heat consumption in Moscow from the introduction of accounting and regulation systems has been measured by six million gigacalories, the subsidies of the city budget for heat have been reduced by 64.1 million. rubles. – Mikhail Albertovich, in the houses of old Moscow are still in operation a lot of physically worn and morally obsolete thermal cast iron boilers. What to do with them? – We try to close small non-economic boiler rooms of the outdated structure, but in some places we modernize with the installation of modern steel small-sized boilers with good environmental characteristics. In addition, our GUP Mosgaz is now busy with an examination, revaluation, repair, and modernization of gas networks of the city. Particular attention is paid to the protection of underground gas pipelines from corrosion. Currently, 3,000 km of gas pipelines out of 3100 were processed, requiring protection. For operational control over the gas consumption and gas distribution mode, the AIS -GAZ system was created – an automated information system. Professional service of gasified apartments is carried out in a planned manner and at the request of subscribers.
Add A Comment