The first stage is the preparation of the pit. All calculations of this construction are completed. You will need to prepare an open -air pit in the construction of the pool. This will require gravel and sand for further tamping.
The second stage is the preparation of the foundation. The base should have 200 millimeters in thickness. The reinforcing framework of the foundation will be a double grid made of reinforcement, which will be bandaged at the connection point using a knitting wire. After that, concrete is poured.
Next, the installation of equipment elements is performed. Nozzles, skimurs and cases are mounted. If there is a project, then you can put geysers and hydromassage. After installing all parts, the formwork should be performed to fill the mixture.
Poured, directly concrete into the pool bowl. The concrete M150-200 is always used for this.
After plaster slopes with your own hands is carried out after . For five wives, concrete will reach the desired strength. After that, the formwork is removed and the processing is performed before plastering.
In conclusion, the seams are rubbed. After the mosaic and hardening of the laying mixture, you can proceed to work on wiping the seams. You can use a two -component mixture of a two -component mixture that has a white color.