Let’s briefly overview of the stages of the construction of the garage on the site for the cottage.
• at the very beginning, to avoid error in the construction of the garage, we make its drawing. We display in the drawing – the dimensions, the place of arrival and the garage gates, the foundation device and the laying of the walls, the circuit of the electrical wiring, the place of the Mauerlat, beam ceilings and the angle of the roof tilt, etc. D.
• Next, you need to mark the location of the garage foundation, after which we pull out the trench, and lay the roofing material and the reinforcing cage to the bottom. All this must be poured with cement mortar. To lay the walls, you can use a cement masonry solution and foam blocks with reinforcing each 3rd row. This is an important point as the manufacture of auto -wires for a car.
• After laying the walls, pour a reinforced monolithic belt, while applying the reinforcing cage and special embedded details of the Mauerlat attachment to the wall.
• Install the rafters of the garage, beam ceiling, waterproofing, crate and context counter.
• We carry out the installation of the roof with the installation of pediments.
• The last stage of the construction of the garage is the interior decoration, wiring, etc. D.