Acceptance: What is how it is carried out

May 28, 2019

Transformers unloaded from the railway platform are transported either directly to the transformer workshop to prepare for installation, or are handed over to the warehouse for storage. Proper storage of transformers is of great importance both from the point of view of their installation, and especially, and from the point of view of the duration of their service life after installation during operation. The most vulnerable part of the transformer is the main isolation, t. e. insulation of windings from one another and from. Therefore, with prolonged storage of the transformer, all measures are taken to protect windings from the influence of the external environment. The volume and content of these measures are determined in which transformers are entered to the construction site from the plant. Transformers with a capacity of up to 1,800 kVA with a voltage of up to 35 kV inclusive are sent by a plant with an installed expand and filled with oil to a normal level. Immediately, after serving them to the warehouse, oil samples from the bottom of the tank is carried out to test its quality (determining the electrical strength and chemical analysis).

When storing these transformers, it is necessary to periodically check the oil level in the extensor and, when it decreases under the influence of changes in the environmental temperature, producing oil, periodically release moisture accumulated in it from the mud for the expander, as well as control the quality of oil according to the rules acting in this regard. For transformers with a capacity of more than 1,800 kv with a voltage of up to 35 kV inclusive, coming from the factory with a tank filled with oil, but with a diver removed during the transportation, no later than 10 days after arrival, the tightness of all the seals of the oil column with a height of 1.5 mV is checked. the course of 3 Cao, the oil sample is taken, as indicated above, the expand is installed and filled to the normal level of oil of proper quality.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

How banks prepared for the introduction of liability for violating mortgage standards

April 11, 2025

Why did Trump impose the highest tariffs on the world’s poorest country?

April 11, 2025

How to turn a former prison into a profitable business?

April 11, 2025

How to provide silence and comfort in a modern apartment

January 24, 2025
Add A Comment

Comments are closed.

Latest Posts

What is SaaS and how can you make money on it?

April 11, 2025

Author’s tour: concept, types and ideas of organization

April 11, 2025

Basics and stages of opening a tour operator company

April 11, 2025

Tourism business ideas: what you need to know

April 11, 2025
Most popular

Ceiling alignment: what to pay attention to

December 11, 2024

How to build a bathhouse on your own site

April 10, 2018

Water-dispersion paints: Features of the finish

December 17, 2024
LoopyIdeas – the best ideas
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
© 2018-2025 LoopyIdeas - loopyideas.com.

Type above and press Enter to search. Press Esc to cancel.