Close Menu
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
LoopyIdeas – the best ideasLoopyIdeas – the best ideas
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
LoopyIdeas – the best ideasLoopyIdeas – the best ideas
Home»Travel»Laying porcelain tiles on the floor: Stages of work

Laying porcelain tiles on the floor: Stages of work

January 22, 2020

The popularity of porcelain tiles can be explained by the fact that it is perfect for use in a humid environment. This material is stable for abrasion, temperature and humidity changes are not afraid of it. When laying porcelain tiles, it is necessary to observe the rules of technology entirely. If the tile is laid down in violation of the rules, loses its properties and type of lining. Cutting the material, during styling, the process is very complex and requires the presence of special equipment, otherwise the material can be easily spoiled or entrusted to professionals.

You will also need, except for porcelain tiles: glue for tiles is frost -resistant, grout, spacers, primer.

Stages of styling.

Stage 1st.

Using a spatula from the surface of the tile, it is necessary to remove paraffin. The room temperature should be +18 ° C.

Stage 2nd.

Clean the base of dust to ensure a clutch of the surface with tiles, treat the surface with a deep primer, applying it to soak the base with an even layer.

Stage 3.

Porcelain stoneware is not placed on a cement solution. For this, they are used, having polymer additives, which provide good adhesion. The contents are poured into the water and everything is stirred to the cream -shaped state.

Stage 4th.

Glue is applied to porcelain. A solution, a smooth spatula, is applied to the floor surface with a gear spatula and leveled, creating grooves.

Stage 5th.

On the base, with glue applied, the porcelain tile is laid and is strongly pressed into the glue. In order to withstand a certain distance between the tiles, crosses are used. Excessive solution is removed with a sponge.

Stage 6th.

When the solution hardens, the seams are wiped with a rubber spatula with a mass, and excess is removed with a sponge.

Stage 7th.

The coating is wiped with a rag and detergents are cleaned.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Author’s tour: concept, types and ideas of organization

April 11, 2025

Basics and stages of opening a tour operator company

April 11, 2025

Tourism business ideas: what you need to know

April 11, 2025

Sound insulation of apartments: how to correctly execute with your own hands

January 24, 2025
Add A Comment

Comments are closed.

Latest Posts

What is SaaS and how can you make money on it?

April 11, 2025

Author’s tour: concept, types and ideas of organization

April 11, 2025

Basics and stages of opening a tour operator company

April 11, 2025

Tourism business ideas: what you need to know

April 11, 2025
Most popular

Varieties of building forests: from which materials they make

November 8, 2018

We dry the damp wall: what to take into account

November 28, 2019

Barbeku furnace: what is, stages of construction

March 22, 2019
LoopyIdeas – the best ideas
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
© 2018-2025 LoopyIdeas - loopyideas.com.

Type above and press Enter to search. Press Esc to cancel.