Close Menu
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
LoopyIdeas – the best ideasLoopyIdeas – the best ideas
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
LoopyIdeas – the best ideasLoopyIdeas – the best ideas
Home»News»How to build a foundation: a sequence of steps

How to build a foundation: a sequence of steps

June 14, 2018

In order to build the foundation, you need to start building a high -quality construction first on paper. Build your future foundation on paper on a scale. Then go to the ground. Using pegs and ropes, mark all the walls of the future building. You need to mark on the outer side of the foundation.

The second step needs to take the width of one and a half brick inside our markup and outline the inside of the foundation. Then you can dig. But you need to dig to a depth below the level of freezing of the soil. What is the level of freezing of the soil. This means that the earth does not freeze completely in winter, but to a certain depth. On average, this value is half a meter. But you will need to find out how much it is with you.

Then it will be necessary to build a reinforcing grate. To do this, you will need to stick around the perimeter of the foundation every 3 meters a couple of reinforcement to a depth of half a meter. Then, from other reinforcements, you need to make a reinforcing grate with a cell of 10 cm, less do not need T. To. It will be problematic to fill the foundation.

When you do everything, you will need to make concrete. It consists of crushed stone, sand, water and cement. It is best to use cement not lower than the M500 brand. If you decide to build the foundation in the fall and temperature up to -7 degrees, then add a liquid detergent to the solution so that the concrete does not freeze during drying. Then you will need to fill the concrete into the pit, just look so that the concrete does not get stuck on the reinforcement and does not form voids under it.

Then it will be necessary to lay the zero row of bricks. They are placed on the foundation perpendicular to the direction of the wall. The meaning of zero is to align it with the ground. On the last layer of zero you need to put a layer of waterproofing. It remains only to fall asleep with the earth that part of the foundation that is visible from the ground and then proceed to the construction of the house.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

How banks prepared for the introduction of liability for violating mortgage standards

April 11, 2025

Why did Trump impose the highest tariffs on the world’s poorest country?

April 11, 2025

How to turn a former prison into a profitable business?

April 11, 2025

How to provide silence and comfort in a modern apartment

January 24, 2025
Add A Comment

Comments are closed.

Latest Posts

What is SaaS and how can you make money on it?

April 11, 2025

Author’s tour: concept, types and ideas of organization

April 11, 2025

Basics and stages of opening a tour operator company

April 11, 2025

Tourism business ideas: what you need to know

April 11, 2025
Most popular

Masonry: what is it, the features of the process

July 5, 2018

Lighting in the rooms: how to do it competently

February 27, 2019

Mountain elements Termobud: What are

April 3, 2018
LoopyIdeas – the best ideas
  • News
  • Tips
  • Travel
  • Technology
  • Sport
  • Life style
  • Society
© 2018-2025 LoopyIdeas - loopyideas.com.

Type above and press Enter to search. Press Esc to cancel.