In an apartment with low ceilings, as a rule, there is no way to mount suspended structures that are made of PVC.
Therefore, many residents are forced to align all concrete floors with cement or putty. This is not as difficult as it seems at first glance. In fact, any person, having got a little acquainted with the work of a male-stucker, can independently carry out repair work to align the surfaces.
First you should stock up on the necessary tools: spatula, sandpaper, grater. For the sealing of cracks, as well as for reliable insulation of construction seams, self -adhesive sealing tape is ideal. This tape is also suitable for closing gaps and joints on the roof. After the seams are finished, you can start aligning the surface. If the ceiling is aligned with concrete floors, then for this it is best to purchase a small hard spatula that perfectly cleanses the surface. The same spatula is needed for applying the aligning mixture.
For a good surface primer, you will also need a special tool that can be applied to a concrete overlap. To stir the mixture, the drill is best suited, but for this you should purchase a special vessel that has increased strength. A durable vessel is needed so that the mixer does not break it when mixing the leveling mixture. If you want to beat off the control line around the entire perimeter of the room, then you can not do without a painting cord. Before installing the beacons, the surface of the ceiling should be primed and let it dry. This may be needed for several days, and if you do not want to wait, then you can buy a quick -drying mixture for alignment.