The entrances to the building under construction are protected by canopies, the size of a plan of at least 2.0×2.0 m. Masonry of cornices protruding from the wall by more than 30 cm is carried out from the final forests; At the same time, temporary fasteners are arranged to fix the masonry, such as supports that are not removed until the solution is completely hardened. The width of the final forests is chosen so that the distance from the edge of the cornice to the fencing of the forests is at least 60 cm.
Entrances to the building under construction
Masonry in winter is carried out in mittens; In the summer, masons protect their hands with attackers. Containers used to supply brick should be factory manufacturing, the standard design – the serviceability of each container and the reliability of the attachment of its case to the pallet are checked upon receipt of the container and daily in the future.
In case of breaks in work on the masonry surface, you cannot leave any objects-brick, cladding slabs, tools, etc. Tesku and brick -cutting are produced in protective glasses. Slag concrete stones are allowed to cut only on scaffolds, and not on the wall.
Stone work on construction amounts to 30-35% of the volume of all construction work in terms of complexity. Stone work is carried out all year round and under various conditions: in pits and trenches, from scaffolds and forests, at high altitude. When working in pits to prevent bruises of masonry, the objects of the edge of the foundations with on -board boards with a height of at least 15 cm, which are attached to the mounts of the mounts.
We recommend: special attention should be paid to the interior. After all, the arrangement of the premises is not only a matter of personal comfort, but also an important aspect of building image. It is worth considering whole glass partitions – they will create the effect of openness, openness and comfort … After all, the walls familiar to us, this is a closed space. And the company “ABS –